Ben Hogg, operations manager at Zycko said:
“Rapid Racking was able to take the project from conception to completion and provide all the necessary expertise. They advised us on installing a two-tier system including a 175m2 fire rated mezzanine floor, which had not been considered previously. This has optimised our working space and greatly increased storage capacity.”